The Hong Kong Section of the Institution of Railway Signal Engineers - Join us become a Professional Engineers !
Login
Member No:

Password:


Lost Password?

Register now!
Main Menu
Activity Photos
Search
IRSE(HK) Technical Forum : Introduction of Automatic Train Operation in East Rail Line on 28/01/2010

Dear All IRSE(HK) Members,

 

You are cordially invited to attend the captioned forum. Details of the forum are:

 

Topic

Introduction of Automatic Train Operation in East Rail Line

 

Background

In year 2000 it was decided to introduce Automatic Train Operation (ATO) system in East Rail Line (ERL) in order to

improve the train frequency from 24 to 27 trains per hour. Both Automatic Train Protection (ATP) system and the

Rolling Stocks in ERL were not originally designed for automatic driving. There were a lot of technical challenges

during the design, installation and commissioning phases. After two years intensive project programme, 37 trainsets

were equipped with ATO and the first ATO train was put into passenger service in December 2003.

 

The purpose of this technical talk is to share the experience gained in this project and some ATO technical knowledge. 

 

Contents

This technical talk will cover the following:

1) Project Scope 

2) Project Programme

3) Feasibility Study Phase - Requirements of Rolling Stock for ATO operation

4) Design Phase - Basic ATO Principle, modification on ATP, solution for Slip/Slide Phenomena, modification on trackside and modification on Rolling Stocks

5) T&C Phase - ATO Tuning, Stopping Accuracy

 

Date         Thursday 28 Jan 2010

Time         1700 – 1830 hours

Venue       2/F Theatre, Fotan Railway House, Fo Tan

Language  Cantonese

Speaker    Mr. Joseph SIN, Senior Construction Engineer-Signal, WIL.                    

 

Programme

 

1700 hours        Reception and Light Refreshment

1730 hours        Presentation

1815 hours        Q&A

1830 hours        End

 

Enrolment       Please reserve your seat by sending an email with your Name, IRSE(HK) membership No. and Organization to me. On completion of the forum, attendance certificate will be issued upon request.  Please address your request during enrolment.

 

Enrolment Deadline : 26 Jan 2010

 


The Hong Kong Section of the Institution of Railway Signal Engineers © 2008. All right reverved. Best View by 1024 x 768 pixels.